News & Events
News & Events
- Advertisement No. C/08/2024(02) - Written Test/Personal Discussion (11th Nov 2024) - POSTPONED
- NCB IC Event: Innovate Youth: Building Tomorrow's Entrepreneurs.
- PG Diploma Admission 2024-25 - Written Test & Interview Reg.-Round II
- List of selected candidates for admission to One Year Post Graduate Diploma in Cement Technology at NCB Ballabgarh for Session 2024-25
Consultancy services for getting NABL Accreditation as per ISO/IEC 17025:2017
Notice on Public Grievance
NCB – CCE EVENTS / Forthcoming Training Programmes
Ongoing Proficiency Testing Schemes
ONLINE Payment Facility
Steps for Online Payment through SB Collect
Last date for Submission of Technical Papers in 18th NCB International Conference & Exhibition extended to 31st August 2024
Last date for applying for National Awards in Indian Cement Industry 2022-24 is extended to 31st August 2024
Post Graduate Diploma in Cement Technology 2024-25 (Date Extended upto 15 July 2024)
NCB requires Lab Analysts, Junior Assistants, Senior Assistant and Designer on Direct Recruitment Basis
New Facilities added in Calibration Services
18th NCB International Conference - Call for Papers
Corrigendum - Compassionate Appointment in NCB for Group “C” & “D
Compassionate Appointment in NCB for Group “C” & “D
18th NCB International Conference, 27-29 Nov 2024 (Bulletin 1)
NCCBM to host 17th International Congress on Chemistry of Cement (ICCC) in 2027 in New Delhi
Centre for Mining, Environment, Plant Engineering and Operations (CME)
Services Offered
- Comprehensive Energy Audit covering Thermal, Electrical & Compressed Air Audit
- Mandatory Energy Audit for cement plants as per PAT (performance achieve and trade) scheme of bureau of energy efficiency (BEE)
- Assessment of Performance of Air Pollution Control Equipments
- SO2 & NOx Emission Assessment Studies
- Pollution Load Assessment
- Preheater Return Dust Measurement
- Air Quality Monitoring (Ambient Air Quality & Stack Emission)
- Optimization of Pyro processing,
- Optimization of Grinding Operations,
- Heat Balance & Gas Balance studies,
- Studies for Utilization of Alternative Fuels and their influence on pyroprocessing
- Electrical quality assurance
- Mechanical quality assurance
Energy Management
Environment Management
Process Optimization and Productivity Enhancement
Third Party Quality Assurance of Government Projects
List of Equipments
S.No |
Name of the Equipment |
1 |
Flue Gas Analyser |
2 |
Digital Manometer |
3 |
Temperature Meter |
4 |
Radiation Pyrometer |
5 |
Vane Anemometer |
6 |
Stack Monitoring Kit (PM, SO2 & NOx) |
7 |
Reparable Dust Sampler |
8 |
Chemiluminescence Ambient NOx Analyser |
9 |
UV Fluorescent Ambient SO2 Analyser |
10 |
Power Analyser |
List of Recent Projects:
S.No |
Name of the Project |
1 |
Heat Balance Study & Dust Load Study for M/s Ultratech Cement Ltd., Unit: Rajashree Cement Works, Malkhed, Karnataka |
2 |
Performance Assessment of Air Pollution Control Equipments, for M/s Travancore Cements Ltd, Kottayam, Kerala |
3 |
Estimation of Preheater Dust Separation Efficiency through measurement of return dust for M/s Ultratech Cement Ltd., Unit: Andhra Pradesh Cement Works, Tadipatri, Andhra Pradesh |
4 |
Performance of Coal Mill & Cooler Air Pollution Control Equipments for M/s Ultratech Cement Ltd., Unit: Rajashree Cement Works, Malkhed, Karnataka |
5 |
Performance of Coal mill Air Pollution Control Equipment and its Adequecy Assessment for M/s Ultratech Cement Ltd., Unit: Rajashree Cement Works, Malkhed, Karnataka |
6 |
Mandatory Energy Audit for M/S Bhavya Cements Ltd, Tangeda, AP |
7 |
Mandatory Energy Audit for M/S Penna Cement Industries, Boyareddipalli, AP |
8 |
Mandatory Energy Audit for M/S Penna Cement Industries, Talaricheruvu, AP |
9 |
Mandatory Energy Audit for M/S Penna Cement Industries, Ganeshpahad, TS |
10 |
Mandatory Energy Audit for M/S The KCP Ltd, Macherla, AP |
11 |
Third Party Quality Assurance for the Work of “Construction work of Exhibition cum Convention Hall “at KTPO, Bengaluru |
12 |
Third Party Quality Assurance for the Work of “Vertical Expansion of SC/ST Hostel block at Muttukadu, Chennai” |
13 |
TPQA for the Work of “Construction of 80 Nos. Type-II Quarters for Indian Coast Guard” at Chicolna, Goa |
14 |
TPQA for the Work of “Construction of 726 Nos. Residential Quarters (288 Nos. Type-II, 288 Nos. Type-III with stilt parking and 150 Nos. Type-IV) for Customs/Central Excise Dept.” at C. R. Colony, Anna Nagar, Chennai. |
15 |
Construction of 152 Nos Type-II. 304 Nos Type-III and 76 Nos Type-IV Quarters for Central Revenue Quarters at Chennai, Tamil Nadu |
16 |
Third Party Quality Assurance (TPQA) for Construction of 112 Quarters in two towers (Stilt+14 Floors) each at SVP NPA, Hyderabad, Telangana. |
Performance Assessment of Bag Filter at UTCL, Rajashree Cement Works, Karnataka |
Return Dust Measurement at UTCL, Andhra Pradesh Cement Works, Andhra Pradesh |
Inspection of sites by NCB engineers during Third Party Quality Assurance studies |